This timeline is made with an assumption that the artist would collaborate
full-time with the persons listed below to develop 'Telematic Drum Circle'
project. The artist will seek appropriate grant funding and institutional
assistance to facilitate this project.
|
|
Title
| Roles
|
|
Artist
|
Concept, Direction, Interaction Design, Developing of Robotic Drum Machines, Mechanical Interface and Website, etc.
|
|
Robotics Engineer
|
Technical Support in Mechanics, Electronics and Pneumatics, Constructing Them with Artist, etc
|
|
Programmer
|
Constructing Server, Web Programming, Developing Video Editing Algorithm and Video Streaming, etc
|
|
Sound Engineer
|
Advising for Selection of Instruments, Designing the Robotic Drum Machines, etc
|
|
Public Relations (2)
|
Promotion, Advertising, Contact Art Centers and Cultural Centers with Artist, etc.
|
|
Helpers (2)
|
Assisting Gallery Setup and Documentation, Assisting De-installation
|
|
TIMELINE
|
1
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
9
|
10
|
11
|
12
|
13
|
14
|
15
|
16
|
17
|
18
|
19
|
20
|
21
|
22
|
|
Prototyping
& Testing
|
3M
|
Developing Electronic Drum Machine & I/O Device (ARM)
|
|
(APM)
|
3M
|
Developing Web Interface, Video Streamming via Internet, and Software
|
|
(AP)
|
1M
| Constructing Server & Data Archive Test
|
|
(ARPM)
|
1M
| Testing Overall Prototype System
|
| (ARM)
|
1M
| Designing 15 Robotic Drum Machines
|
| (AP)
|
1M
| Designing Website
|
| (AP)
|
2M
| Designing Softwares (Video Editing Algorithms)
|
|
Constructing
& Testing
|
Constructing 15 Robotic Drum Machines
|
2M
|
(ARM)
|
|
Building Website & Web Server
|
2M
| (AP)
|
|
Testing Overall System
|
1M
| (ARPM)
|
|
Pre-installation
|
Stabilizing Overall System
|
6W
| (ARP)
|
|
Promotion
|
Promotion (web / cultural centers)
|
2W
| (Apr)
|
|
Gallery Setup
|
Gallery Setup
|
2W
| (ARPH)
|
|
Documentation
|
Documentation (video / photo)
|
3D
| (AH)
|
|
Exhibtion
|
(AH) Exhibition
|
1M
|
|
|
De-installation
|
(ARPH) De-installation & Packing Up
|
2W
|
|
|
TOTAL
|
|
21 MONTHS 3 DAYS
|
Artist:
|
84 weeks
|
|
Robotics Engineer:
|
42 weeks
|
|
Programmer:
|
54 weeks
|
|
Sound Engineer:
|
44 weeks
|
|
Public Relations:
|
2 weeks (x 2 persons)
|
|
Helpers:
|
10 weeks (x 2 persons)
|
|
|
Explanatory
Notes
|
|
|
: w/ Artist + Robotics Engineer + Sound Engineer
|
|
: w/ Artist + Robotics Engineer + Programmer
|
|
|
: w/ Artist + Programmer + Sound Engineer
|
|
: w/ Artist + Public Relations
|
|
|
: w/ Artist + Programmer
|
|
: w/ Artist + Robotics Engineer + Programmer + Helpers
|
|
|
: w/ Artist + Robotics Engineer + Programmer + Sound Engineer
|
|
: w/ Artist + Helpers
|
|
M
| : Month
|
W
| : Week
|
|
D
| : Day
|
(1 week = 5 days, 1 day = 8 hours)
|
|
1. EQUIPMENT & MATERIAL COST
|
No.
|
Item
|
Unit Cost (USD)
|
Quantity
|
Cost (USD)
|
|
01
|
In-line Valve H180-4E1
|
49.15
|
15
|
737.25
|
|
02
|
Double Acting Cylinder
|
44.95
|
15
|
674.25
|
|
03
|
Wireless Communication Module (RF Link - 2000,000bps)
|
25.95
|
15
|
389.25
|
|
04
|
PIC16F877A
|
8.79
|
5
|
43.95
|
|
05
|
PIC16F84A
|
5.49
|
5
|
27.45
|
|
06
|
ActiveWire USB Device
|
65.00
|
4
|
260.00
|
|
07
|
Monostable Multivibrator(CD4047BC) + 2N7000
|
17.45
|
15
|
261.75
|
|
08
|
Stepper Motor (PK2913-01BA, Pontech Inc.)
|
308.00
|
1
|
308.00
|
|
09
|
Stepper Motor Controller (STP 101, Pontech Inc.)
|
159.00
|
1
|
159.00
|
|
10
|
Structural Aluminum Extrusions
|
-
|
-
|
2,500.00
|
|
11
|
Industrial Air Compressor (278-5312H, Bel-Aire)
|
3,659.00
|
1
|
3,659.00
|
|
12
|
6 Fittings + 50 Feet
of Hose
|
57.33
|
15
|
859.95
|
|
13
|
Niveus A/V Storage Server: 1 Terabyte
|
2,999.00
|
1
|
2,999.00
|
|
14
|
Apple Power Macintosh G5 Quad 2.5GHz + 20" Display
|
4,098.00
|
2
|
8,196.00
|
|
15
|
Apple iSight WebCam, Wide Angle Lens & Other Accessories
|
349.00
|
2
|
698.00
|
|
16
|
Video Projector (NEC LT380)
|
2,995.00
|
1
|
2,995.00
|
|
17
|
High Contrast Black Rear Projection Screen
|
2,105.00
|
1
|
2,105.00
|
|
18
|
Large-Capsule Condenser Microphone (Solaris, M-Audio)
|
349.95
|
1
|
349.95
|
|
19
|
Cycling '74 Max/MSP/Jitter Programming Environment
|
850.00
|
1
|
850.00
|
|
20
|
Miscellaneous items
|
-
|
-
|
1,500.00
|
|
|
SUBTOTAL
|
$ 29,572.80
|
2. INSTRUMENTS RENTAL FEE
|
No.
|
Particulars
|
Cost (USD)
|
|
01
|
15 Instruments Rental
|
TBA
|
|
02
|
Instrument Transportations
|
TBA
|
|
|
SUBTOTAL
|
TBA
|
3. LABOR COST
|
No.
|
Position
|
Allowance / Week (USD)
| Number of Person(s)
|
Week
|
Cost (USD)
|
|
01
|
Artist
|
TBA 600.00
|
1
|
84
|
TBA 50,400.00
|
|
02
|
Robotics Engineer
|
TBA 600.00
|
1
|
42
|
TBA 25,200.00
|
|
03
|
Programmer
|
TBA 600.00
|
1
|
54
|
TBA 32,400.00
|
|
04
|
Sound Engineer
|
TBA 600.00
|
1
|
44
|
TBA 26,400.00
|
|
05
|
Public Relations
|
TBA 500.00
|
2
|
2
|
TBA 2,000.00
|
|
06
|
Helper
|
TBA 500.00
|
2
|
10
|
TBA 10,000.00
|
|
|
SUBTOTAL
|
TBA $ 146,400.00
|
4. DEVELOPMENT STUDIO & GALLERY RENTAL FEE
|
No.
|
Space
|
Allowance / Week (USD)
|
Period (week)
|
Cost (USD)
|
|
01
|
Development Studio
|
500.00
|
64
|
32,000.00
|
|
02
|
Gallery
|
1,500.00
|
4
|
6,000.00
|
|
|
SUBTOTAL
|
$ 38,000.00
|
|
TOTAL BUDGET
|
$ 213,972.80 $ 67,572.80 + Instruments Rental Fee + Labor Cost
|
|